Inspired were appointed in June 2020 working at-home during the Covid-19 pandemic period to assist our client with a strategic re-configuring and enhancement of their new home, in a bustling holiday town on the Somerset coast.

Now with planning authority consent obtained, our technical design team were appointed by our clients to provide them with a set of construction drawings enabling them to construct their extensions with the peace of mind that their undertakings will be compliant with Building Regulations. Working with our Structural Engineering partners at Julian Burrows Ltd, our clients appointed Principal Contractor at Buildit, based in Minehead, commenced works in earnest. Our Surveying Director Justin Dover carried out a site inspection of ongoing works to guide the site team regarding matters of compliance regarding interior adjustments to the existing roof structure to facilitate the progression of interior adaptions.

Foundations have been placed for a frontal entrance extension, and sub-structure foundations and walls are now in place pending installation of the ground floor structure.

If you require planning & technical design assistance, together with technical compliance support as your site works proceed, feel free to Call Inspired on 01823 270764.