https://inspired-partnership.com/wp-content/uploads/2019/12/Boardwalk-Flythrough-1.mp4 Inspired are currently working alongside suppliers & contractors to implement the replacement of a glass atrium covering a retail Boardwalk within the heart of a Holiday...
Inspired were appointed in late 2018 to assist our client with a strategic re-configuring and enhancement of their home, with a view that the existing spaces would be manipulated and extended to function for the family in a much better way. Our client presented a...
Our clients have now moved into their beautiful new home. IPL were commissioned to value engineer, revise the design and contract administer the project to realisation on site. Achieving bespoke design and sustainability targets this home incorporates an air source...
The existing dais at Temple Methodist Church was accessible by two steps with unequal risers and no handrail that was proving difficult access for those unsteady on their feet. We were commissioned by the church to design a set of movable steps with handrail that...
Inspired is currently overseeing phases 2 and 3 of a refurbishment of 28 blocks of two storey accommodation buildings containing 240 units of 2 berth residential accommodation, which provide temporary self-catering accommodation for 480 members of the resorts resident...
Inspired has recently overseen Phase 3 of the refurbishment of 18 Blocks of two and three storey accommodation buildings containing 354 units of 4 and 6 berth self -catering residential accommodation, which provide holiday accommodation for 1486 guests of the Holiday...